As-built performance
The final stage impact assessment of the Future Buildings Standard. Secondary legislation, statutory guidance published by MHCLG 24 March, 2026 defines as-built performance as being "The actual energy performance of a building once it has been constructed and commissioned, which may differ from performance estimated at the design stage."
The term is also used to describe complete drawings of a finished buildings, though the intention of these is similar and at a similar stage the content and outcome is different. See article as-built drawings and record drawings.
For further information and details from the perspective of performance see performance gap between building design and operation, closing the gap between design and as-built performance, post occupancy evaluation., building use studies (BUS), building performance evaluation, performance in use and more.
[edit] Related articles on Designing Buildings
- Appointing consultants.
- As-built drawings and record drawings.
- Building performance evaluation.
- Building performance metrics.
- Closing the gap between design and as-built performance.
- Energy audit.
- Maintenance.
- Performance of exemplar buildings in use: Bridging the performance gap FB 78.
- Performance in use.
- Post occupancy evaluation.
- Post occupancy evaluation process.
- Sick building syndrome.
- Thermal comfort.
- Wellbeing.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.
CIOB photography competition is open for entries.
ECA Edmundson apprentice of the year award
Finalists announced.
Major new study exposes serious knowledge gaps.
Generating energy from internal light as well as sunshine.
ECA welcomes plans to strengthen subcontractor quality control.
Combining mid-career qualifications with experience broadens career opportunities.
Why being a mentor can help your career.

















